Sabine Neches Waterway

Back
Project Location Date
Sabine Neches Waterway Direct Pipe® Project Port Arthur, Tx. 04/23/2015

 

Laney redesigned the crossing, designed the entry pit and thruster foundation and installed the Direct Pipe®. Our engineering team was fully involved in the pre-construction planning, design improvement, submittals to USACE for approval of final design, and monitoring during construction.