Clark's Fork

Back
Project Location Date
Clark's Fork Carbon Co., Bridges, Mt. 12/21/2011

 

Two crossings of 12" steel pipe replacement of 1,200' and 1,322' through layers of cobbles and boulders into bed rock. The winter working conditions required full size heated tents of both entry and exit sides. Plus the tough soil conditions needed steel casing to be installed on both sides with two rigs performing an intersept pilot hole.